YaraVita BORTRAC 150

YaraVita BORTRAC 150

YaraVita Bortrac 150 is a concentrated liquid boron formulation manufactured to exacting quality control standards to guarantee consistent analysis, crop safety and product performance. YaraVita Bortrac 150 has low viscosity to improve handling, mixing and spraying.

The liquid formulation makes it easy to measure, pour and mix the product in the spray tank.

The product is specifically formulated to provide maximum crop safety. This helps to ensure that application will not cause damage to the crop which can reduce it's market value.

The purity of raw materials selected for this product makes it safe for application to the crop.

A broad tank mixability makes it easy to co-apply the products with agrochemicals, saving both time and money. Just as important, free access to Tankmix information online or via smart phones makes it quick and easy to check whether products can be co-applied.

Asparagus

Asparagus: 2 to 4 l/ha applied to ferns prior to senescence. Water rate: minimum 50 l/ha.

Aubergine

Aubergine (field grown): 2 l/ha applied from the 4 to 6 leaf stage onwards. Repeat applications may be necessary. Water rate: minimum 500 l/ha.

Frijoles

Vegetables [Beans, Onions, Potatoes, Tomatoes (field grown)]: 1 to 2 l/ha as soon as there is sufficient foliage to intercept a spray. Repeat 10 to 14 days later if necessary. Water rate: 200 l/ha.

Carrots

Carrot: 3 l/ha when crop is 15cm tall. For moderate to severe deficiency repeat applications at 10 to 14 day intervals. Water rate: 50 to 200 l/ha.

Cereals

Cereals: 1 l/ha. Apply from the 4 leaf stage to pseudo stem erection, (Zadoks Growth Stage 14 to 30). Water rate: minimum 200 l/ha.

Chinese Cabbage

Chinese Cabbage: 3 l/ha at 4 to 6 leaf stage with repeat applications at the above rate at 10 to 14 day intervals for moderate to severe deficiency. Water rate: minimum 50 l/ha.

Citrus

Citrus: 2 to 3 l/ha at white buds or when white buds are separated. Water rate: 500 to 1000 l/ha.

Cotton

Cotton: 2 l/ha at 4 to 6 leaf stage, at appearance of first flower bud squares and again at open flowers stage. Water rate: minimum 150 l/ha.

Cucumber

Cucumber (field grown): 2 l/ha from the 4 leaf stage. Repeat at 10 to 14 days intervals if necessary. Water rate: minimum 50 l/ha.

Fertigated Crops

Fertigation: Use at 0.3 litres per 1000 metres squared. Repeat at 7 to 14 day intervals as necessary.

Garlic

Garlic: 2 l/ha as soon as there is sufficient foliage to intercept spray. A second application may be made at the same rate 10 to 14 days later. Water rate: minimum 50 l/ha.

Groundnuts / peanuts

Groundnuts/Peanuts: 2 l/ha at the 4 to 6 leaf stage. Water rate: minimum 50 l/ha.

Leek

Leek: 3 l/ha applied two weeks after transplanting or in the case of direct sown crops, when the crop is 15 cm tall. For moderate to severe deficiency one or two repeat applications may be necessary at 10 to 14 day intervals. Water rate: minimum 200 l/ha.

Nursery Stock / Ornamentals

Nursery Stock/Ornamentals: 1 l/ha as soon as there is sufficient leaf area to intercept a spray. Repeat at 10 to 14 day intervals as necessary. Do not apply once first buds are open. Spray a maximum of three applications per crop per annum. Water rate: minimum 100 l/ha.

Oil Palm

Oil palm: 1 l/ha. Three applications per year (one every 4 months). Water rate: 30 l/ha minimum. For Nursery (up to 2 years old): 1 l/ha applied every two months. Water rate: 30 l/ha minimum.

Peas

Peas (field grown): 2 l/ha at 4 to 6 leaf stage. For moderate to severe deficiency, a repeat application may be necessary 10 to 14 days later. Water rate: minimum 200 l/ha.

Pineapple

Pineapple: 1 to 2 l/ha pre-flowering. Water rate: minimum 200 l/ha.

Protected Crops

Protected Crops: 0.1 litres per 100 litres water maximum concentration. Water rate: 1000 l/ha maximum. Refer to equivalent field grown crop for application timing.

Roses (Field Grown)

Roses (Field Grown)): (Cut Roses): 0.5 l/ha. Three applications at 8, 15 and 25 days after regrowth. Water rate: 500 l/ha.

Sorghum

Sorghum: 3 l/ha from 4 to 8 leaves. Water rate: minimum 30 l/ha.

Squash (Field Grown)

Squash (field grown): 2 l/ha from the 4 leaf stage. Repeat at 10 to 14 days intervals if necessary. Water rate: minimum 50 l/ha.

Sunflower

Sunflower: 2 l/ha from 2 pairs of leaves up to flower bud stage. Repeat if necessary at 10 to 14 day intervals within this period. Water rate: minimum 30 l/ha.

Water Melon

Water melon (field grown): 0.5 l/ha. Three applications at 15, 30 and 45 days after germination. Water rate: 400 l/ha.

Asparagus

Asparagus: 2 to 4 l/ha applied to ferns prior to senescence. Water rate: minimum 50 l/ha.

Aubergine

Aubergine (field grown): 2 l/ha applied from the 4 to 6 leaf stage onwards. Repeat applications may be necessary. Water rate: minimum 500 l/ha.

Frijoles

Vegetables [Beans, Onions, Potatoes, Tomatoes (field grown)]: 1 to 2 l/ha as soon as there is sufficient foliage to intercept a spray. Repeat 10 to 14 days later if necessary. Water rate: 200 l/ha.

Carrots

Carrot: 3 l/ha when crop is 15cm tall. For moderate to severe deficiency repeat applications at 10 to 14 day intervals. Water rate: 50 to 200 l/ha.

Cereals

Cereals: 1 l/ha. Apply from the 4 leaf stage to pseudo stem erection, (Zadoks Growth Stage 14 to 30). Water rate: minimum 200 l/ha.

Chinese Cabbage

Chinese Cabbage: 3 l/ha at 4 to 6 leaf stage with repeat applications at the above rate at 10 to 14 day intervals for moderate to severe deficiency. Water rate: minimum 50 l/ha.

Citrus

Citrus: 2 to 3 l/ha at white buds or when white buds are separated. Water rate: 500 to 1000 l/ha.

Cotton

Cotton: 2 l/ha at 4 to 6 leaf stage, at appearance of first flower bud squares and again at open flowers stage. Water rate: minimum 150 l/ha.

Cucumber

Cucumber (field grown): 2 l/ha from the 4 leaf stage. Repeat at 10 to 14 days intervals if necessary. Water rate: minimum 50 l/ha.

Fertigated Crops

Fertigation: Use at 0.3 litres per 1000 metres squared. Repeat at 7 to 14 day intervals as necessary.

Garlic

Garlic: 2 l/ha as soon as there is sufficient foliage to intercept spray. A second application may be made at the same rate 10 to 14 days later. Water rate: minimum 50 l/ha.

Groundnuts / peanuts

Groundnuts/Peanuts: 2 l/ha at the 4 to 6 leaf stage. Water rate: minimum 50 l/ha.

Leek

Leek: 3 l/ha applied two weeks after transplanting or in the case of direct sown crops, when the crop is 15 cm tall. For moderate to severe deficiency one or two repeat applications may be necessary at 10 to 14 day intervals. Water rate: minimum 200 l/ha.

Nursery Stock / Ornamentals

Nursery Stock/Ornamentals: 1 l/ha as soon as there is sufficient leaf area to intercept a spray. Repeat at 10 to 14 day intervals as necessary. Do not apply once first buds are open. Spray a maximum of three applications per crop per annum. Water rate: minimum 100 l/ha.

Oil Palm

Oil palm: 1 l/ha. Three applications per year (one every 4 months). Water rate: 30 l/ha minimum. For Nursery (up to 2 years old): 1 l/ha applied every two months. Water rate: 30 l/ha minimum.

Peas

Peas (field grown): 2 l/ha at 4 to 6 leaf stage. For moderate to severe deficiency, a repeat application may be necessary 10 to 14 days later. Water rate: minimum 200 l/ha.

Pineapple

Pineapple: 1 to 2 l/ha pre-flowering. Water rate: minimum 200 l/ha.

Protected Crops

Protected Crops: 0.1 litres per 100 litres water maximum concentration. Water rate: 1000 l/ha maximum. Refer to equivalent field grown crop for application timing.

Roses (Field Grown)

Roses (Field Grown)): (Cut Roses): 0.5 l/ha. Three applications at 8, 15 and 25 days after regrowth. Water rate: 500 l/ha.

Sorghum

Sorghum: 3 l/ha from 4 to 8 leaves. Water rate: minimum 30 l/ha.

Squash (Field Grown)

Squash (field grown): 2 l/ha from the 4 leaf stage. Repeat at 10 to 14 days intervals if necessary. Water rate: minimum 50 l/ha.

Sunflower

Sunflower: 2 l/ha from 2 pairs of leaves up to flower bud stage. Repeat if necessary at 10 to 14 day intervals within this period. Water rate: minimum 30 l/ha.

Water Melon

Water melon (field grown): 0.5 l/ha. Three applications at 15, 30 and 45 days after germination. Water rate: 400 l/ha.